384 m³ GRP Water Tank Project for a Data Center in Malaysia

Malaysia 384m³ GRP water tank project for data center cooling, featuring corrosion resistance, modular installation, and reliable water storage.

This project is located in Malaysia, Southeast Asia. The water tank is mainly used for the storage and supply of cooling water for an Internet company’s data center.

Based on the site conditions and water storage requirements, the customer selected a 12 m × 8 m × 4 m GRP modular water tank, with a total capacity of approximately 384 m³. As the core water storage equipment of the cooling system, the tank works together with the pump and valve system and the circulation system to provide a stable water supply for the data center.

GRP Water Tank Installation in Progress at a Data Center in Malaysia

As we all know, the operation of data center servers, network equipment, and the rapidly developing AI computing infrastructure generates a significant amount of heat, which requires continuous and reliable cooling. To support their global business operations, major Internet companies are building data centers in different regions around the world. They generally select locations with favorable conditions, such as abundant water resources, and adopt efficient and cost-effective cooling circulation systems.

Cooling systems typically include precision air conditioning systems, air-cooled/liquid-cooled cooling equipment, indirect evaporative cooling systems, cold-plate liquid cooling, immersion cooling units, waste heat recovery systems, and energy-efficient ventilation equipment. Modular sectional water tanks serve as water storage equipment for liquid cooling systems.

GRP Water Tank Design Drawing for a Data Center in Malaysia
Layer-by-Layer Installation of GRP Water Tank Panels

Project Parameters

ItemSpecification
Project CountryMalaysia
ApplicationCooling Water for Data Center
Tank TypeGRP Modular Water Tank
Tank Dimensions12 × 8 × 4 m
Tank CapacityApprox. 384 m³
Tank StructureModular Assembly Structure
Connection MethodBolted Connection
Installation MethodOn-site Assembly
Malaysia Data Center

Project Requirements

Data centers have high requirements for infrastructure reliability. The cooling system must operate continuously and reliably, while the water storage equipment needs to provide sufficient storage capacity and maintain a certain level of redundancy based on the maximum planned computing capacity.

During the water tank selection process, the customer mainly considered the following factors:

1. Large-Capacity Cooling Water Storage

The 12 × 8 × 4 m water tank provides approximately 384 m³ of water storage capacity, ensuring an adequate water reserve for the data center cooling system.

2. Suitable for Hot and Humid Climates

The data center is located in Southeast Asia, where temperatures and humidity are relatively high. Since the water tank will be exposed to a humid environment for a long period, excellent corrosion resistance is essential.

Therefore, this project uses highly corrosion-resistant GRP panels as the main tank panels. Compared with steel panels such as hot-dip galvanized panels, GRP offers excellent corrosion resistance and relatively low cost, making it suitable for long-term use in hot and humid environments.

3. Easy On-Site Installation and Future Expansion

Due to the large size of the 384 m³ water tank, using an integrated welded structure would increase transportation and on-site construction difficulties. Therefore, the customer selected a modular panel design, which significantly reduces transportation costs and makes future expansion of the data center easier.

The modular water tank uses bolted connections, allowing flexible on-site assembly without being significantly restricted by site conditions.

Internal Tie Rods of GRP Water Tank
Rubber Plugs for GRP Water Tank
Inside of the Flange Opening of the GRP Water Tank

Water Tank Installation

The water tank was installed next to the data center, with a dedicated cooling equipment room reserved nearby. The foundation consists of strip concrete foundations with a 100 mm spacing, combined with channel steel supports.

We dispatched installation workers to the project site to complete the installation and provide training to local workers.

Installation Process:

  1. Inspect the tank foundation and installation conditions.
  2. Position the bottom tank panels.
  3. Install the side panels layer by layer.
  4. Install the internal reinforcement structure and tie-rod system.
  5. Install the top structure and accessories.
  6. Apply sealant to all connection points.
  7. Install the inlet, outlet, overflow, drain, and other pipe connections.
  8. Conduct a comprehensive inspection of the completed tank.
  9. Perform a full-water test and check the tank for watertightness.
  10. After acceptance, connect the tank to the data center cooling water system.

After being connected to the data center cooling system, the water tank has provided a stable water supply with no leakage, and the customer was highly satisfied with the project.

The customer is also planning to add an additional emergency fire water tank, providing an extra layer of protection for the data center’s water supply and fire safety.

FAQ

Why Did the Data Center in Malaysia Choose a GRP Water Tank?

Malaysia has a hot and humid tropical climate, so water tanks require excellent corrosion resistance. GRP (Glass Reinforced Plastic) water tanks offer excellent corrosion resistance and are less affected by humid environments. Their modular design also makes them suitable for cooling water storage in large-scale data centers.

Can the GRP Water Tank Be Expanded According to the Data Center’s Future Requirements?

Yes. GRP modular water tanks use standardized panels and bolted connections, providing excellent installation flexibility. If the data center expands its server capacity or adds more cooling equipment in the future, the tank capacity can be redesigned according to actual requirements, and additional modular tanks can be added.

What Tests Are Required After the Data Center Cooling Water Tank Is Installed?

After installation, the water tank needs to undergo a comprehensive inspection, including the panel connections, bolts, sealing points, internal reinforcement structure, and pipe connections. A full-water test and watertightness inspection are then conducted. The tank can be officially connected to the data center cooling circulation system only after confirming that the structure is stable, the connections are secure, and there is no water leakage.